Automated Storage For Steel Service Centres With Gantry Robot
video
Automated Storage For Steel Service Centres With Gantry Robot

Automated Storage For Steel Service Centres With Gantry Robot

Our automated storage for steel service centres keeps bar, tube and sections in steel storage units on cantilever racks. A gantry robot runs on rails above the racks and brings every unit an order needs to one loading station, two at a time. Each unit holds up to 5,000 kg (11,000 lbs) of 6 m, 9 m or 12 m stock. The system suits stockholders and metals service centers that sell many grades and sizes in small quantities.
·Several units can leave the store for one order
·Oldest stock is offered first, so bottom bundles stop ageing
·Up to 5,000 kg (11,000 lbs) per storage unit
·Gantry up to 10 m (32.8 ft) high over racks of 7 to 8 m
·Stock levels and locations in the warehouse management system (WMS), with an ERP link assessed per system

Where the Hours Go in a Long Products Bay

 

Picture the order desk at 7 a.m. A customer wants six lengths of 40 × 40 mm square tube, two of 60 mm round bar and one length of 100 mm channel. Three sizes, three bundles, three crane lifts. If the round bar sits under four other bundles, it is five lifts before anyone has cut anything.

 

That is a normal morning in a floor-stacked bay. The crane is the bottleneck, and the slinger is the second one. Bundles that land on top get sold first. The ones underneath grow older, and nobody sees how old until stocktake.

 

A gantry store changes the order of work. The operator stays at the loading station. The material comes to the operator, one storage unit at a time, and the crane is free for trucks.

 

Blue gantry robot at the end of a tall block of dark steel storage units, with two loading tables and an operator in front

 

Mixed Orders: Several Units at One Station

 

Most service-centre orders are mixed. That is why the loading station has two decks. The gantry sets the first unit on the upper deck and the second on the lower deck. The operator takes bars from both without waiting.

 

When the first unit is done, it goes back to its location with whatever is left in it. The third unit takes its place. The WMS updates the count for each one as it returns.

 

Cut-to-length orders work the same way. Bars go from the unit to your saw, and the remaining length stays in the unit. We confirm the link to your saw for each saw make and model, rather than promise one interface for every machine.

Flow diagram in three lanes: mill-length bundles go in through the loading station, orders bring two units to the double-deck station, and cut pieces are bundled per order for dispatch

 

Goods In Without Putting Bundles on the Floor

 

A delivery of mill-length bundles is lifted from the truck straight onto the loading station. The gantry takes the storage unit to a free location and the WMS records size, location and date. There is no intermediate stack on the floor waiting for "later".

 

The WMS allocates first in, first out. When an order asks for 60 mm round bar, it offers the oldest unit of that size first. Stock-age alerts flag material that has stayed too long, and reorder alerts tell purchasing when a size runs low.

 

Heat numbers and mill certificates usually live in your ERP. The WMS can connect to mainstream ERP and MES software; we assess the connection for each system. Handheld barcode terminals are part of the WMS for stock counts.

 

Specifications

 

For a service centre, three lines in this table matter most: the load per storage unit, the unit length and the loading station. Values marked "typical" come from finished CK projects.

Group

Item

Value

Capacity

Load per storage unit

Up to 5,000 kg (11,000 lbs); usually 3,000 kg (6,600 lbs) for 6 m stock and 5,000 kg (11,000 lbs) for 12 m stock

Capacity

Stock length

6 m, 9 m or 12 m (19.7, 29.5 or 39.4 ft) stores

Dimensions

Storage unit length

Material length plus about 50 mm (2 in) at each end

Dimensions

Gantry height / rack height

Up to 10 m (32.8 ft) / 7 to 8 m (23 to 26 ft)

Operation

Gantry travel / lift speed

Up to 25 m/min (82 ft/min) / 6 to 8 m/min (20 to 26 ft/min), typical

Operation

Positioning

±2 mm with mobile racks, ±5 mm with fixed racks, typical

Operation

Loading station

Double-deck; several units can leave the store for one order

Control

Software

WMS with locations, first-in first-out allocation, stock counts, reorder and stock-age alerts, handheld barcode terminals

Control

Panel

Separate PLC panel in English and Chinese; other languages loaded from your translation

Power

Supply

380 V, 3-phase, typical; installed power calculated for each project

Construction

Finish

Powder coating as standard; paint or hot-dip galvanizing on request

Ratings apply to material lying in the storage unit. Each quotation states whether the unit's own weight is included. The system is for indoor use.

Plan view diagram of four rack rows between two gantry rails, a gantry robot and a double-deck loading station; storage unit length equals material length plus about 50 mm at each end

 

Mobile or Fixed Racks for a Stockholding Bay

 

Fixed cantilever racks give the gantry a free path to every row. Mobile racks sit on floor rails and close up, leaving one open aisle where the gantry is working. More stock fits on the same floor.

 

The choice depends on how often you need a far row. A centre with a few fast sizes and a long tail of slow ones often puts the slow tail on mobile rows. Typical positioning is ±2 mm with mobile racks and ±5 mm with fixed racks. For long material, see the 12 m gantry store on fixed cantilever racks, or browse our range of automated long material stores.

 

Orange gantry robot over long rows of blue cantilever racks holding steel storage units, with yellow guardrail along the side

 

When a Gantry Store Is the Wrong Buy

 

Some service centres sell full bundles. The truck brings ten bundles in, and next week ten bundles go out to a customer unopened. For that trade, floor storage or a crane-served roll-out bar and pipe rack does the job at a fraction of the cost.

 

Yard storage is another case. The gantry store is built for indoor halls, so material kept outside stays outside.

 

And plan for power cuts. The gantry cannot be moved by hand, and nobody may enter the rack area to get bars out. If a truck must leave during an outage, keep a small buffer of fast sizes outside the store. If you want to stay with crane access for now, look at the electric roll-out racks on the CK Metal Storage Solutions website.

 

Installed yellow gantry robot beside blue cantilever racks loaded with steel tube and section bundles in a production hall

 

Rails, Floor and Commissioning

 

Gantry rails are either set into the slab or fixed on its surface. Work on site follows a fixed order: floor load check, setting out, rails, gantry, racks. We give you the floor loads for your layout before you commit.

 

Nobody walks into the rack area while the gantry runs. An aisle-entry alarm is available as an option.

 

Lead time is 60 to 90 days, including quality checks, trial assembly, testing and export packing. A factory engineer commissions the system on site. Wear parts ship with the order, and we answer service requests within 24 hours by phone or email, with remote video support. The warranty is 1 year and can be extended. We are CE certified and hold ISO 9001:2015 and ISO 14001:2015 certificates; the racks are a patented design (China utility model patents).

 

FAQ

 

Q: We stock about 800 sizes. Do they all have to go in the store?

A: No. Many stockholders put the sizes they cut and pick every day into the store and keep slow, full-bundle sizes elsewhere. The WMS only manages what is inside the store.

Q: Can one order pull several sizes at once?

A: Yes. The loading station has two decks, and several storage units can leave the store for one order.

Q: How do we keep track of heat numbers?

A: Through your ERP. The WMS records the location, size and date of every unit and can connect to mainstream ERP software; we assess the link for your system.

Q: How many orders an hour can it handle?

A: That depends on store length, rack height and the share of mixed orders. We calculate it from your layout and a sample day of orders, and we do not quote a standard figure.

Q: Do you build for 12 m mill lengths?

A: Yes. We build stores for 6 m, 9 m and 12 m (19.7, 29.5 and 39.4 ft) material. For 12 m stock, units are usually rated at 5,000 kg (11,000 lbs).

 

Get a Layout for Your Service Centre

 

Send us the details below. We reply with a layout drawing and a price.

  • Your size list: grades, sections, diameters, and how many sizes you would put in the store
  • Mill lengths and the heaviest bundle per size
  • A sample day of orders, with sizes and quantities per order
  • Saw make and model if the store feeds a saw
  • A hall drawing with clear height, crane positions, doors and floor details

Request a service-centre storage layout and quote.

 

Hot Tags: automated storage for steel service centres with gantry robot, China automated storage for steel service centres with gantry robot manufacturers, suppliers, factory