Replace Floor Stacking With Automated Storage For Long Goods
video
Replace Floor Stacking With Automated Storage For Long Goods

Replace Floor Stacking With Automated Storage For Long Goods

To replace floor stacking with automated storage, CK Metal Storage Solutions moves your bars, tubes and profiles into steel storage units on cantilever racks. A gantry robot above the racks picks any unit at any level, so no bundle is moved to reach another. Racks rise to 7 to 8 m (23 to 26 ft) under a gantry of up to 10 m (32.8 ft), and each storage unit is rated up to 5,000 kg (11,000 lbs). It is built for steel stockholders, service centers and fabricators whose crane drivers now restack piles to free one bundle.
·Direct access to every bundle: no restacking
·The overhead crane works only at the loading station, never over the stock
·Storage height up to 7 to 8 m (23 to 26 ft) instead of a knee-high or waist-high stack
·Stock recorded by location, quantity and age in a warehouse management system (WMS)
·Bundles up to 5,000 kg (11,000 lbs) per storage unit; 3,000 kg (6,600 lbs) is usual for 6 m material

One Pick from a Floor Stack

 

A saw operator asks for a size that sits at the bottom of a pile. The crane driver and a slinger now work through the stack from the top.

Diagram comparing a floor stack, where five bundles are lifted off before the bottom bundle is free, with a gantry that lifts one storage unit directly from a cantilever rack

  1. The slinger fixes chains or straps to the top bundle by hand.
  2. The crane lifts it and sets it down on another pile or on free floor.
  3. Both repeat for every bundle above the one the saw needs.
  4. After cutting, the moved bundles often stay where they landed, and the next pick starts from a different pile.

 

The bottom of a floor stack also tends to hold the oldest stock, because new deliveries go on top. First in, first out is hard to keep. People also stand near suspended loads and beside piles that can shift when a bundle is pulled.

 

What Changes After the Move

 

The work of finding and freeing a bundle disappears. The comparison below covers the daily tasks that change.

Task

Floor stack with overhead crane

Gantry store

Reaching a bundle at the bottom

Lift off and set down every bundle above it

The gantry lifts that storage unit only

Slinging

Chains or straps attached by hand for each lift

Only when a bundle enters or leaves at the loading station

People in the storage area

Slinger and crane driver work among the piles

Nobody inside the rack area while the gantry works

Finding stock

From memory, tags or a walk through the yard

The WMS shows every unit by material and location

Stock rotation

Oldest stock stays under newer bundles

First in, first out set as a WMS rule

Height used

Height of a stable pile

Racks up to 7 to 8 m (23 to 26 ft)

 

Yellow gantry robot between blue cantilever racks holding steel tubes and profiles in a high-bay workshop

 

Your Crane Keeps One Job

 

An existing overhead crane or forklift still delivers and collects material, but only at the loading station. Inside the rack area, all lifting is done by the gantry.

  • Goods in: the crane or a forklift sets the incoming bundle, whole or split, into an empty storage unit at the loading station. The gantry stores the unit.
  • Goods out: the gantry brings the unit to the loading station. The crane lifts the bundle out, or the operator takes single lengths by hand.
  • With a double-deck loading station, two storage units are at the station at once: one being emptied, one queued behind it.

 

Front view of a yellow truss gantry with two loading tables in front of a long grey cantilever rack block

 

Case: 6 m Profiles Taken Off the Floor

 

One plant makes aluminum heat-sink profiles for the automotive industry. Its 6 m stock lay in floor stacks. Lower layers were only reachable after the loads above them were moved, and the workshop was hard to keep in order.

 

We replaced the stacks with a gantry store: a 5.6 m (18.4 ft) gantry over 65 m (213 ft) of cantilever racks. A forklift carries each loaded unit, over 600 kg (1,320 lbs), from the loading station straight to production. In this project, storing and retrieving now takes one operator instead of at least two, and no restacking is needed.

 

Planning the Changeover

 

The slab and the building height decide whether and how a hall can take a gantry store. The order below is how a changeover usually runs.

  • Site survey: hall length, width and clear height, crane positions, and the slab under the planned rails.
  • Stock profile: material types, lengths, bundle weights, the number of sizes and the picks per shift.
  • Layout and quotation: we draw the racks, gantry and loading station for your hall.
  • Production: 60 to 90 days, including a trial assembly in our factory.
  • Installation: rails first, then the gantry, then the racks. Plan where the floor stock waits while each section is built.
  • Commissioning and handover: a load test under working conditions, then operator and maintenance training.

Side elevation diagram: cantilever racks 7 to 8 m high under a gantry up to 10 m high, a low floor stack for comparison, a loading station and a 1 m clear zone

No material may be stored within 1 m (3.3 ft) of the rack area. Gantry rails can sit flush in the slab or on top of it. Plan for a slab rated around 1.5 to 1.6 t/m² (310 to 330 lb/ft²) distributed; that is the range of typical projects.

 

Key Specifications

 

Group

Item

Value

Capacity

Load per storage unit

Up to 5,000 kg (11,000 lbs); usually 3,000 kg (6,600 lbs) for 6 m material and 5,000 kg for 12 m material

Capacity

Material length

6 m, 9 m or 12 m (19.7, 29.5 or 39.4 ft)

Dimensions

Rack height / gantry height

Up to 7 to 8 m (23 to 26 ft) / up to 10 m (32.8 ft)

Operation

Gantry travel speed

Up to 25 m/min (82 ft/min)

Operation

Rack types

Fixed cantilever racks, or mobile racks on floor rails

Area

Clear zone around the rack area

1 m (3.3 ft)

Ratings apply to bundles supported over the whole length of the storage unit. Your quotation states if the unit weight is included in the rating.

 

When Floor Storage Can Stay

 

Not every floor stack needs automation. A gantry store makes sense when many sizes are picked often.

  • A few sizes, picked as whole bundles once or twice a day: a heavy-duty roll-out cantilever rack served by your crane removes restacking at lower cost. We recommend those racks up to about 5 m (16.4 ft) high.
  • Material stored outdoors: this page covers indoor systems.
  • Stock needed during a power cut: the gantry has no hand-operated mode, and people may not enter the rack area to lift stock out.

Mixed bars, tubes and flats can also go on a roll-out long stock rack. Specifications of the hand-cranked versions are on the CK Metal Storage Solutions main website.

 

 

Long row of blue cantilever racks loaded with storage units, with an orange gantry robot and a yellow guardrail at the far end

 

FAQ

 

Q: Can we keep our overhead crane?

A: Yes. The crane loads and unloads bundles at the loading station. It no longer travels over stored material to dig out bundles.

Q: How much floor space will we gain?

A: It depends on your stack height today and the height of your hall. We draw the current stacks and the gantry layout on the same plan, so you can compare the storage positions on your own floor.

Q: Can one person run the store?

A: In the aluminum profile project above, one operator handles storing and retrieval, compared with at least two people before. Staffing in your plant depends on the number of picks per shift.

Q: Our heaviest bundles are over 3 t. Is that a problem?

A: No. The design limit is 5,000 kg (11,000 lbs) per storage unit. We set the rating from your heaviest bundle, and stores for 12 m material usually use 5,000 kg units.

Q: Do we need a new floor?

A: Not always. We check the slab during the survey. Surface-mounted rails need less civil work than recessed rails.

 

Send Us Your Floor Stack Details

 

With these details, we can return a layout drawing and a price for your hall:

  • A photo and the dimensions of the area where stock is stacked now
  • Hall clear height, crane capacity and crane hook height
  • Material types, lengths, the heaviest bundle and the number of sizes
  • Picks per shift, and the saws or machines the material goes to

Request a layout to replace your floor stacks.

 

Hot Tags: replace floor stacking with automated storage for long goods, China replace floor stacking with automated storage for long goods manufacturers, suppliers, factory

Send Inquiry