Six Parts of the System
Every installation combines the same six parts. The layout, the number of rack rows and the storage unit size change from project to project.
- Gantry robot. A portal frame on floor rails. Its carrier lifts a storage unit from both ends and raises it above the racks before it travels.
- Gantry rails, recessed into the slab or mounted on the floor surface.
- Cantilever racks, either fixed or on motorised mobile bases.
- Steel storage units (also called cassettes). Each unit holds one bundle or a part bundle and supports it along its full length.
- A loading station at floor level. A double-deck station can hold two storage units at once.
- Control system and WMS: a PLC control panel with touchscreen, plus software that records every unit by material and location.

The storage unit is a little longer than the material. We allow about 50 mm (2 in) at each end so bar ends do not hit the frame when the gantry lifts or sets down the unit.
Specifications
Each long stock system is built to order. The table lists design limits; values marked "typical" come from completed projects.
|
Group |
Item |
Value |
|
Capacity |
Load per storage unit |
Up to 5,000 kg (11,000 lbs); usually 3,000 kg (6,600 lbs) for 6 m material and 5,000 kg for 12 m material |
|
Capacity |
Material length |
6 m, 9 m or 12 m (19.7, 29.5 or 39.4 ft) |
|
Capacity |
Number of storage units |
Set by building length, rack type and rack height |
|
Dimensions |
Gantry height |
Up to 10 m (32.8 ft) |
|
Dimensions |
Rack height |
Up to 7 to 8 m (23 to 26 ft) |
|
Dimensions |
Storage unit length |
Material length plus about 50 mm (2 in) at each end |
|
Operation |
Gantry travel speed |
Up to 25 m/min (82 ft/min) |
|
Operation |
Lift speed |
6 to 8 m/min (20 to 26 ft/min), typical |
|
Operation |
Positioning |
±2 mm with mobile racks, ±5 mm with fixed racks, typical |
|
Operation |
Drives |
Servo motors with closed-loop position control |
|
Control |
Modes |
Online automatic, single-machine automatic, manual and maintenance manual |
|
Control |
Panel language |
English and Chinese as standard; other languages from your translation |
|
Power |
Supply |
380 V, 50 Hz, 3-phase, typical; installed power calculated for each project |
|
Construction |
Steel and finish |
Q235 or Q355 structural steel; powder coating as standard, paint or hot-dip galvanizing on request |
Load ratings assume the bundle rests along the full length of the storage unit. Whether the storage unit's own weight counts toward the rated load is stated in each quotation.
Fixed or Mobile Cantilever Racks
Floor area usually decides this choice. Both rack types work under the same gantry; the difference is how many aisles stay open.

|
Item |
Fixed cantilever racks |
Mobile cantilever racks |
|
Aisles |
A permanent aisle between racks for the gantry carrier |
Rows move on floor rails; one aisle opens where the gantry works |
|
Floor rails |
Gantry rails only |
Gantry rails plus rails for every mobile base |
|
Positioning (typical) |
±5 mm |
±2 mm |
|
Typical project |
5 levels per side, 10 levels per double-sided rack |
12 mobile rack groups in one block |
|
Choose it when |
Floor space is available and you want the simplest civil work |
Floor space is the limit and you need more units in the same hall |
An existing hall with fixed cantilever racks can sometimes be automated by adding a gantry. Rack strength, arm spacing and floor condition decide this, so we check them during the site survey. For racks loaded by an overhead crane without automation, see the roll-out cantilever rack range.
One Storage and Retrieval Cycle
People handle material only at the loading station. The gantry does all lifting inside the rack area.
- An overhead crane or forklift puts a full or part bundle into an empty storage unit on the loading station.
- The operator enters the material code or scans a barcode. The WMS picks a free location using its storage rules.
- The gantry picks up the storage unit from both ends. End guides centre the unit on the carrier.
- The carrier rises above the racks, and the gantry travels to the target rack.
- The unit is lowered onto the cantilever arms. The WMS books the stock to that location.
Retrieval runs the same way in reverse. Two storage units can be sent out together when the loading station has two levels. On cantilever racks, load balance matters: units are placed from the bottom up and spread evenly on both sides. The WMS checks the balance of each rack and moves units on its own if a rack becomes unevenly loaded.

Where the System Fits
A good fit if
- Bundles are stacked on the floor, and the crane driver moves top bundles to reach the one underneath.
- Your hall has 5 to 10 m of clear height that manual racks cannot use.
- You stock many sizes or grades and need the right one at the saw or machining line on time.
- You want stock by location and age in software, not on a clipboard.
Not the right choice if
- You keep a few sizes and pick them a few times a day. A roll-out cantilever rack served by your crane costs less. We recommend those racks up to about 5 m high (4 levels plus the top).
- Your building is much taller than 10 m and you want to use the full height. The gantry stops at 10 m (32.8 ft), even in a 14 m hall.
- Stock must be reachable during a power cut. The system cannot be operated by hand without power, and manual handling inside the rack area is not allowed.
- Material is stored outdoors. These pages cover indoor systems only.
For a single motorised rack without a gantry, compare the electric roll-out cantilever rack.
Typical Project: 6 m Aluminium Profiles
An aluminium profile maker supplying heat-sink parts to vehicle builders kept its 6 m profiles in floor stacks. To reach a lower layer, workers first moved the layers above it.
We installed a gantry storage system with a 5.6 m (18.4 ft) gantry and 65 m (213 ft) of racks. Each storage unit holds more than 600 kg (1,320 lbs) and goes to the production line by forklift. In this project, one operator now stores and retrieves material that needed at least two people before. No restacking is needed to reach a given unit.

Safety and Controls
Motion stops on overload. The servo drives watch motor current, give an alarm and then stop the motor if the current stays above its rating.
- Mobile rack rows carry a laser distance sensor and an anti-collision device.
- An aisle-entry alarm is available as an option. Nobody may enter an open aisle while the gantry is working.
- Keep a 1 m (3.3 ft) zone around the rack area free of stored material.
- Noise is 85 dB or less at 1.5 m (4.9 ft) from the equipment in typical projects.
Building, Floor and Installation
A floor survey comes first. In typical projects, the slab carries a distributed load of 1.5 to 1.6 t/m² (310 to 330 lb/ft²), with point loads of 1.9 to 4.2 t (4,200 to 9,300 lbs).
- Installation order: check slab capacity, mark the rail centre lines, fit the rails, install the gantry, then install the racks.
- Recessed rails sit flush with the floor and need slab work. Surface-mounted rails are faster to fit.
- Provide a 3-phase industrial supply near the system.
- Acceptance includes a load test under working conditions, followed by operator and maintenance training.

Delivery, Warranty and Certification
Lead time is 60 to 90 days from order. That time covers quality checks, a trial assembly in our factory, commissioning tests and export packing.
- A factory engineer installs and commissions the system on site; commissioning usually takes about one week.
- Warranty: 1 year, with extended warranty available. Spare wear parts ship with the system.
- Support: response within 24 hours by phone or email, plus remote video guidance.
- Trade terms: DDU preferred; EXW, FOB and CIF available.
- CE certified. ISO 9001:2015 and ISO 14001:2015 certified. Patented cantilever rack design (China utility model patents).
Photos and videos of finished gantry systems are on the CK Metal Storage Solutions website.
FAQ
Request a Layout for Your Long Goods Store
Send us the details below. We will reply with a layout drawing and a quotation.
- Material types, sizes and lengths, and the heaviest bundle
- Number of sizes and the stock per size
- Retrievals per shift, and the saws or machines the material feeds
- Hall plan, clear height, crane height and floor slab data
- Photos or a video of the current storage area
Ask for a long goods storage layout and quote.
Hot Tags: automated long goods storage system with gantry robot, China automated long goods storage system with gantry robot manufacturers, suppliers, factory